| 
                           Last Modified: 05-08-2025 | 
                        6.11:8.1.0  | 
                        
                           Doc ID: RM100000001EWIA | 
                      
                     
                        | 
                           Model Year Start: 2019 | 
                        
                           Model: RAV4 | 
                        
                           Prod Date Range: [11/2018 - 10/2023] | 
                      
                     
                        | 
                           Title: MAINTENANCE: A25A-FKS BATTERY: INSTALLATION; 2019 - 2023 MY RAV4 [11/2018 - 10/2023] | 
                      
                   
                  INSTALLATION
                   
                  PROCEDURE
                   
                  1. INSTALL BATTERY 
                  (a) Install the battery to the vehicle. 
                  
                     
                        
                           | 
                               (b) Install the No. 2 battery clamp with the bolt to the battery clamp sub-assembly. 
                              Torque:  
                              18.5 N·m {189 kgf·cm, 14 ft·lbf} 
                            | 
                           
                              
                            | 
                         
                     
                   
                  (c) Connect the cable to the positive (+) battery terminal and tighten the nut. 
                  Torque:  
                  5.0 N·m {51 kgf·cm, 44 in·lbf} 
                  (d) Attach the 2 claws to install the connector cover to the positive (+) battery terminal. 
                   
                  2. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL 
                  (a) Connect the cable to the negative (-) battery terminal and tighten the nut. 
                  Torque:  
                  w/o Stop And Start System :   
                  5.0 N·m {51 kgf·cm, 44 in·lbf} 
                  w/ Stop And Start System :   
                  5.4 N·m {55 kgf·cm, 48 in·lbf} 
                  NOTICE: 
                  When disconnecting the cable, some systems need to be initialized after the cable is reconnected. 
                  Click here
                        
                           
                               
                           
                        
                        
                           
                               
                           
                        
                        
                           
                               
                           
                        
                        
                           
                               
                           
                        
                        
                           
                               
                           
                        
                        
                           
                               
                           
                        
                        
                           
                               
                           
                        
                     
                   
                  
                |