Last Modified: 01-30-2024 |
6.11:8.1.0 |
Doc ID: RM100000001FENX |
Model Year Start: 2019 |
Model: RAV4 HV |
Prod Date Range: [11/2018 - 08/2020] |
Title: A25A-FXS (EMISSION CONTROL): EGR VALVE: INSTALLATION; 2019 - 2020 MY RAV4 HV [11/2018 - 08/2020] |
INSTALLATION
CAUTION / NOTICE / HINT
NOTICE:
This procedure includes the installation of small-head bolts. Refer to Small-Head Bolts of Basic Repair Hint to identify the small-head bolts.
Click here
PROCEDURE
1. INSTALL EGR VALVE ASSEMBLY
(a) Using an 8 mm socket wrench, install the EGR valve assembly to the EGR valve bracket with the bolt.
Torque:
10 N·m {102 kgf·cm, 7 ft·lbf}
(b) Align and fit the hole of the EGR valve bracket to the pin of the camshaft housing.
|
|
(c) Using the 8 mm socket wrench, install the EGR valve assembly with the EGR valve bracket to the camshaft housing with the bolt.
Torque:
10 N·m {102 kgf·cm, 7 ft·lbf}
(d) Using an 8 mm socket wrench, connect the fuel pipe sub-assembly to the EGR valve bracket with the bolt.
Torque:
10 N·m {102 kgf·cm, 7 ft·lbf}
(e) Connect the No. 4 water by-pass hose to the EGR valve assembly, and slide the clip to secure the hose.
(f) Connect the No. 8 water by-pass hose to the EGR valve assembly, and slide the clip to secure the hose.
2. INSTALL NO. 1 EGR PIPE SUB-ASSEMBLY
(a) Install a new EGR inlet gasket to the intake manifold.
(b) Install a new EGR valve adapter gasket to the No. 1 EGR pipe sub-assembly.
(c) Using an 8 mm socket wrench, install the No. 1 EGR pipe sub-assembly to the intake manifold and EGR valve assembly with the 4 bolts.
Torque:
10 N·m {102 kgf·cm, 7 ft·lbf}
3. CONNECT EGR COOLER ASSEMBLY
(a) Install a new EGR valve gasket to the EGR valve assembly.
NOTICE:
Make sure that the claws of the EGR valve gasket are toward the EGR valve assembly side.
|
|
(b) Connect the EGR cooler assembly to the EGR valve assembly with the 2 bolts.
Torque:
24 N·m {245 kgf·cm, 18 ft·lbf}
4. CONNECT ENGINE WIRE
(a) Attach the 2 wire harness clamps to connect the engine wire.
(b) Install the bolt.
Torque:
10 N·m {102 kgf·cm, 7 ft·lbf}
(c) Connect the EGR valve assembly connector.
(d) Attach the 3 hose clamps to connect the No. 1 fuel vapor feed hose and No. 2 fuel vapor feed hose.
|
|
*1
|
No. 1 Fuel Vapor Feed Hose
|
*2
|
No. 2 Fuel Vapor Feed Hose
|
|
|
5. ADD ENGINE COOLANT (for Engine)
Click here
6. INSPECT FOR COOLANT LEAK (for Engine)
Click here
7. INSPECT FOR EXHAUST GAS LEAK
Click here
|