Last Modified: 01-30-2024 6.11:8.1.0 Doc ID: RM100000001FEO3
Model Year Start: 2019 Model: RAV4 HV Prod Date Range: [11/2018 - 02/2019]
Title: A25A-FXS (EMISSION CONTROL): EGR COOLER: REMOVAL; 2019 MY RAV4 HV [11/2018 - 02/2019]

REMOVAL

CAUTION / NOTICE / HINT

The necessary procedures (adjustment, calibration, initialization or registration) that must be performed after parts are removed and installed, or replaced during EGR cooler assembly removal/installation are shown below.

Necessary Procedures After Parts Removed/Installed/Replaced

Replaced Part or Performed Procedure

Necessary Procedures

Effect/Inoperative Function when Necessary Procedure not Performed

Link

Replacement of inverter with converter assembly

Resolver learning

  • DTCs are stored
  • Slight vibration at a vehicle speed of 5 km/h (3 mph) or less
  • Shock or vibration during acceleration

2019 - 2020 MY RAV4 HV [11/2018 - 08/2020]; HYBRID / BATTERY CONTROL: MOTOR GENERATOR CONTROL SYSTEM (for 2WD with NICKEL METAL HYDRIDE BATTERY): UTILITY

Gas leak from exhaust system is repaired

Inspection After Repair

  • Poor idle, etc.
  • Engine start function, etc.

2019 - 2020 MY RAV4 HV [11/2018 - 08/2020]; A25A-FXS (ENGINE CONTROL): SFI SYSTEM (w/o Canister Pump Module): INITIALIZATION

PROCEDURE

1. DRAIN ENGINE COOLANT (for Engine)

Click here 2019 MY RAV4 HV [11/2018 - 02/2019]; MAINTENANCE: A25A-FXS COOLANT (for Engine): REPLACEMENT+

2. REMOVE INVERTER WITH CONVERTER ASSEMBLY

Click here 2019 MY RAV4 HV [11/2018 - 02/2019]; HYBRID / BATTERY CONTROL: INVERTER WITH CONVERTER (for 2WD): REMOVAL

3. REMOVE EGR COOLER ASSEMBLY

(a) Slide the 2 clips and disconnect the No. 3 water by-pass hose and No. 4 water by-pass hose from the EGR cooler assembly.

*1

No. 3 Water By-pass Hose

*2

No. 4 Water By-pass Hose

(b) Remove the 5 bolts and EGR cooler assembly from the cylinder head sub-assembly and EGR valve assembly.

(c) Remove the EGR valve gasket from the EGR valve assembly.

(d) Remove the EGR cooler gasket from the EGR cooler assembly.