| 
                           Last Modified: 05-08-2025 | 
                        6.11:8.1.0  | 
                        
                           Doc ID: RM100000001FHA6 | 
                      
                     
                        | 
                           Model Year Start: 2019 | 
                        
                           Model: RAV4 HV | 
                        
                           Prod Date Range: [11/2018 -                    
                                       ] | 
                      
                     
                        | 
                           Title: HYBRID / BATTERY CONTROL: HV RELAY ASSEMBLY (for NICKEL METAL HYDRIDE BATTERY): INSTALLATION; 2019 - 2025 MY RAV4 HV [11/2018 -        ] | 
                      
                   
                  INSTALLATION
                   
                  PROCEDURE
                   
                  1. INSTALL HV BATTERY JUNCTION BLOCK ASSEMBLY 
                  CAUTION: 
                  Be sure to wear insulated gloves and protective goggles. 
                  (a) Install the HV battery junction block assembly to the HV battery with the 4 nuts. 
                  Torque:  
                  7.5 N·m {76 kgf·cm, 66 in·lbf} 
                  NOTICE: 
                  If the HV battery junction block assembly has been struck or dropped, replace it with a new one. 
                  (b) Connect the HV battery junction block assembly connector. 
                  NOTICE: 
                  Make sure that the connectors are connected securely. 
                  (c) Engage the 2 claws to install the wiring harness protector. 
                  (d) Connect the HV battery junction block assembly connector. 
                  NOTICE: 
                  Make sure that the connectors are connected securely. 
                  (e) Engage the 2 claws to close the wiring harness protector. 
                  (f) Engage the clamp. 
                  (g) Connect the HV battery junction block assembly connector. 
                  NOTICE: 
                  Make sure that the connectors are connected securely. 
                  (h) Connect the electric vehicle battery plug assembly with the bolt. 
                  Torque:  
                  7.5 N·m {76 kgf·cm, 66 in·lbf} 
                   
                  2. INSTALL UPPER HV BATTERY COVER SUB-ASSEMBLY 
                  Click here
                        
                           
                               
                           
                        
                     
                   
                   
                  3. INSTALL NO. 1 HYBRID BATTERY EXHAUST DUCT 
                  Click here
                        
                           
                               
                           
                        
                     
                   
                   
                  4. CONNECT FLOOR WIRE 
                  CAUTION: 
                  Be sure to wear insulated gloves. 
                  (a) Engage the 2 clamps to connect the floor wire. 
                  (b) Connect the HV battery junction block assembly connector. 
                  (c) Connect the electric vehicle battery plug assembly connector. 
                  (d) Engage the clamp. 
                   
                  5. CONNECT FLOOR UNDER WIRE 
                  Click here
                        
                           
                               
                           
                        
                     
                   
                   
                  6. INSTALL NO. 1 HV BATTERY COVER PANEL RH 
                  Click here
                        
                           
                               
                           
                        
                     
                   
                   
                  7. INSTALL REAR SEAT CUSHION LEG SUB-ASSEMBLY 
                  Click here
                        
                           
                               
                           
                        
                     
                   
                   
                  8. INSTALL BATTERY SERVICE COVER BOARD 
                  Click here
                        
                           
                               
                           
                        
                     
                   
                   
                  9. INSTALL NO. 2 BATTERY SERVICE COVER BOARD 
                  Click here
                        
                           
                               
                           
                        
                     
                   
                   
                  10. INSTALL REAR DOOR SCUFF PLATE LH 
                  Click here
                        
                           
                               
                           
                        
                        
                           
                               
                           
                        
                        
                           
                               
                           
                        
                        
                           
                               
                           
                        
                     
                   
                   
                  11. INSTALL NO. 3 BATTERY SERVICE COVER BOARD 
                  Click here
                        
                           
                               
                           
                        
                     
                   
                   
                  12. INSTALL REAR DOOR SCUFF PLATE RH 
                  HINT: 
                  Use the same procedure as for the LH side. 
                   
                  13. INSTALL NO. 1 INDOOR ELECTRICAL KEY ANTENNA ASSEMBLY 
                  Click here
                        
                           
                               
                           
                        
                     
                   
                   
                  14. INSTALL REAR SEAT CUSHION LOCK HOOK 
                  Click here
                        
                           
                               
                           
                        
                     
                   
                   
                  15. INSTALL BENCH TYPE REAR SEAT CUSHION ASSEMBLY 
                  Click here
                        
                           
                               
                           
                        
                     
                   
                   
                  16. INSTALL SERVICE PLUG GRIP 
                  Click here
                        
                           
                               
                           
                        
                     
                   
                  
                |